Commit Graph
2 Commits
Author SHA1 Message Date
Mitchell-JohnsonandClaude Opus 5 a07a444170 The Space tab is Usage; the Cron tab is Jobs
Both are named for what they do rather than the tool underneath, the way Services is.
Old links and saved rail orders still land in the right place. The Go packages and their
endpoints keep their names, with a pointer in each to what the UI calls them.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-24 12:54:23 -07:00
Mitchell-JohnsonandClaude Fable 5.1 7e3e916f25 Arrange the rail: drag pages into your own order, kept with the account
The close cross on a detail pane is drawn, not a glyph, and sits in no box.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-09-22 19:59:25 -07:00